Bags are simple for small jobs; a truck saves a day of mixing on big ones. The crossover depends on your time, help, access and local prices. Here is how to decide.
Concrete needed
1.36 cubic yards
36.7 ft³ · 1.04 m³ · includes 10% extra
You need about 1.36 cubic yards of concrete, or 62 bags of 80 lb mix.
Bags of premix
- 12340 lb bags
- 9850 lb bags
- 8260 lb bags
- 6280 lb bags
- —20 kg bags
- —25 kg bags
- Before extra1.23 yd³ (33.3 ft³)
- Weight of bags4,960 lb
- Per hole—
- Ready-mix costAdd a price per yd³
- Bagged costAdd a price per bag
One 80 lb bag makes about 0.60 ft³ (manufacturer's published yield). Bags are rounded up.
At 1.36 yd³ (62 × 80 lb bags, 4,960 lb), bags and a small ready-mix load are both reasonable. Ask local suppliers for their minimum load and short-load fee before deciding.
Estimate only, not a quote or engineering advice. Disclaimer
What a yard of bags means
One cubic yard is 45 bags of 80-lb mix (3,600 lb) or 60 bags of 60-lb mix. Every bag has to be loaded, unloaded, opened, mixed and placed, and the whole pour should go in before the first batches start to set.
Bags usually make sense when
- The job is small: fence or deck posts, a few Sonotubes, steps, a small pad or a repair.
- The site is hard to reach with a truck, or you need to pour in stages.
- You want to work at your own pace with no truck on the clock.
Ready-mix usually makes sense when
- The pour is more than about a yard and must be placed in one go, such as a slab or a wall.
- You want consistent concrete from one batch, with a specified strength.
- A truck can get close, or you can arrange a pump or buggies.
Short loads and minimums
Ready-mix plants price by the cubic yard (or m³). Many have a minimum order, and many add a short-load fee when you order less than a full truck. Fees and minimums differ a lot from plant to plant, so we don't quote numbers. Call two or three suppliers and ask:
- Price per yard for the mix you need, and the minimum order.
- Short-load fee for your yardage, and the delivery or fuel charge.
- How much unloading time is included, and the charge per extra minute.
- Whether they offer smaller trucks or trailer loads for small pours.
Then compare with the bag total. Enter your price per yard and per bag in the calculator; it shows both costs side by side for your exact pour.
Other options
Some yards sell concrete in towable trailers, and some suppliers run volumetric mixer trucks that mix on site and bill for what you use, which can suit small or uncertain pours. Availability varies by area.
Frequently asked questions
At what point is ready-mix cheaper than bags?
It depends on local prices and fees. Get the price per yard plus any short-load and delivery fees, then compare with the price per bag times the number of bags. The calculator does this when you enter both prices.
What is a short-load fee?
An extra charge many ready-mix suppliers add when an order is smaller than a full truckload, to cover the trip. Amounts vary by supplier, so ask when you get a quote.
How many bags of concrete equal a yard?
45 bags of 80 lb, 60 of 60 lb, 72 of 50 lb or 90 of 40 lb.
Related
Sources
- QUIKRETE: Concrete Mix No. 1101 data sheet (Revised Oct 2022; checked Nov 11, 2026)